From: route@monster.com
Sent: Saturday, April 16, 2016 2:07 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Chechano Leacock
Wireless Telecom Professional
(305) 992-6520 • chechano@outlook.com » Profile Accomplished,
results-oriented meticulous professional with a 16yr construction,
engineering, telecommunications & management background. A ‘from the
ground up’ career in the field of radio frequency technology has helped
develop a comprehensive working understanding of all aspects of the wireless
telecom industry. I am an excellent listener and a spatial critical thinker,
very analytical individual and as such processes are never considered in
isolation but always within the framework of larger complex systems. I’m a
role player whose primary focus is always on getting the job done correctly
& efficiently. In
this dynamic field, with constantly evolving technologies where changes are
constant, a core understanding of the logic behind each action has helped me
effectively cross communicate the needs of the client across organizations to
ensure the successful role out of any given project. My
aim is to continue a telecom career in a work environment where I can use my
technical and managerial experiences to advance the interests of that
organization, while simultaneously learning, growing & progressing. » Skills,
Certificates Applications MS Office, Site
Handler, Siterra, LDO apps, CAM Tool, CART, NTP1Tool etc, FSO Dashboard,
Sweepmasters, Adobe. Photoshop/sims, CAD, WS FTP, Element Manager,RBS
Manager, Anritsu, Smart laptop. Certificates OSHA-10, First Aid /
CPR AED cert, ATT LSO, Fiber Optics Cleaning & Testing, ATT76300,
Comtrain Tower Climbing & Safety Rescue, Anritsu Testing, PIM Testing,
RFS Safety, CDL Class A, NBSS tools, Telecom Basics, CFM cert, CM supplier
management, CART cert, Ericsson Project Management & 65mhz certs. » Work
Experience ERICSSON: 300 S Park
Rd, Ste 150, Hollywood FL, 33021 Construction Manager – Sprint SNV & Ericsson 65mhz Projects Miami Market Broward/Dade/Keys 317 sites constructed (10/2012 to 02/2015)
Complete management and coordination of all pre, active & post cx related
activities in the installation of Sprints SNV Macro & DAS cell sites in
the SFL region ·
Pre Cx: Bid walks with GC’s and Landlords for onsite build plans.
Verify and redline all CD’s as necessary. Create/review/approve service
scopes & efr’s to ensure vendor PO issuance. Verify building permits,
COI’s, FAA permits, Street Closure permits. Obtain CSMS & CMC tickets for
cx as needed. Equipment call off to local Market and delivery/pickup
scheduling to sites and SP's as needed. ·
Active Cx: Responsible for securing NTP's from tower owners such as Crown
Castle, ATC, SBA etc and coordinating all site access, managing the logistics
of getting all equipment, personnel, cranes etc on and off site. Monitoring
site activity and communicating with NIC via whiteboard. Resolve any
and all issues which arises throughout the build. ·
Post Cx: Conduct Punch walks to identify & correct defects &
deviations from approved plans. Confirm connectivity to backhaul and clear
site of all alarms. Rectify landlord issues. Make final redlines as necessary
to close permits. Review & Approve all closeout,cop,ccsa & cam
documents. Ensure all milestones are met, actualized and site is ready for
customer handoff. Construction Manager - Sprint SNV- Atlanta Market / 57 sites
constructed (2/12 to 09/12) ·
Scope of Work consistent as
outlined above. AFL Network Services; 170 Ridgeview Center Drive, Duncan, SC 29334 Ericsson Field Tech/ Troubleshooting - ATT Network, Charlotte
&Atlanta Market (11/2011 –
2/2012) ·
ATT/Ericsson LTE RRU 11
Replacement project. ·
Ensured quality audit checks were
done before handing the site over to the carrier. Performed all fiber sweep
and Coax sweep tests. Completed and managed all paperwork and performed Site
Handler uploads. ExteNet
Systems/ Database Telecom; 25 Smith
Street, Nanuet, NY 10954 (6/2011-11/2011) West Point Military Academy DAS installation project. · This was a major project covering the complete installation and
integration of multiple (DAS) distributed antenna systems throughout all the
barracks on the compound at West Point US Military Academy, NY. · This incorporated DAS design analysis, full installation of all
equipment with very involved sweep testing and data collecting at each
junction point. System Integration, signal mapping and optimizations based on
the results of the mapping PARSONS/EXI; 715
N. Glenville Drive, Suite 430, Richardson, TX 75081 Ericsson WCDMA RBS Field Engineer/ Troubleshooting -3G - ATT Network,
(11/2010 – 6/2011) Nokia 2G/3G Flexi Technician ·
Integration and Call-testing Node
B RBS 3106, 3206, 3418, 3518 series cabinets to include 1st,2nd,3rd, or 4th carriers in the LA ,MS
Markets according to all Ericsson/ATT standards. ·
Perform installation programming
of the Ericsson UMTS 3106/3206 series equipment components. Script
manipulation and uploading for performance and operations to include
co-sighting configurations. ·
Troubleshooting performance
degrading issues with PCO group, NIC, LNRC, and MSN to complete site
integrations with ATM/IP connectivity. ·
Commissioning and integrating the
Node B 2G Flexi Cabinets in South TX markets. ·
NSN Cluster 5 ToyCell multi-radio
flexi install & commissioning: Miami,FL; JacksonvilleFL; Mobile, AL;
Louisville, KY markets Clearwire; 450
W. John Carpenters Freeway, Irving, TX Construction Manager/Quality Assurance -3G/4G Sprint/Clearwire
Network (9/2009 – 10/2010) ·
Multiple functions to include all
phases of the operational lifecycle of site builds, bid walks and award,
power coordination, construction drawing design and modification, quality
assurance and re- trip prevention as well as close-out documentation and
acceptance per Clearwire guideline objectives. ·
Facilitating cross-functional
interactions with all build teams to insure equipment inventory distribution
for productive operational implementation and full build completion. ·
Assist in programming and
pre-commissioning Clear equipment to include, Asentria, World -wide package
(Switch), Valere (power supply), dragon wave modems and microwave radios over
IP. ·
Coaching and developing associate
assistance to communicate and track day to day deadlines and scheduling with
all Clear accepted contractors on strategic site builds to insure 100%
quality and operation. Techedge Corp., Jackson, TN Assistant Operations Manager UMTS Remote Unit and 850-1900
Overlay, (2/2009 –
7/2009) Nokia Flexi Node B Installation, ·
Installation of Ericsson 850 UMTS
overlay with Siemens 850 GSM to pass Anritsu testing and sweep performance
measurement. Perform installation programming of the
Argus power bays and shelter wiring of all required functional equipment to
include true position GPS, Diplexers, RXAIT’s for site sharing, as well as
PDU’s powering Bias-T’s as per AT&T site tech specifications. Accurate
alignment with use of Tangent electrical antenna programming. ·
Multiple carrier battery removal
and Andrews’s battery construction and installation. Power installation from
Argus power bay to MCPA rack units. Troubleshooting of all systems to insure
optimal performance and operation. ·
Site audits as well as punch list,
quality assurance and re- trip prevention. ·
T-mobile deployment and
installation of 60 to 80 Nokia Flexi Node B UMTS cabinets to include the
Detroit, Indianapolis and Oklahoma City Markets. Tower Co., 6017 Triangle Drive, Raleigh, NC & Ft.
Lauderdale, FL Nokia Ultra Site Engineer & Ericsson RBS Project Coordinator (7/2006 - 11/2008) ·
Removal of Nortel GSM equipment to
replace with Nokia Ultra Site Cabinet 2G/3G. ·
Troubleshooting Nokia UMTS and
Ericsson RBS equipment, 2101, 2102; 2106 and UMTS per T-mobile, Florida. ·
Intricate Ericsson OMT use and
antenna RFS functions to ensure best operational system quality. ·
Mechanical and electrical
assembly of Nokia Ultrasite equipment and all intricate components
required. ·
Integration of existing Emerson
power cabinets and T-1 testing to properly access the new equipment. ·
Software uploading and
commissioning and integration of new sites to ensure projected
operational performance. Excellent knowledge of Nokia Radio Access products (BSC,
TCSM, RNC, 2G/3G BTS), protocols and troubleshooting tools. ·
Troubleshooting, repairing
equipment, punch list, call testing and 911 verification as well as alarm
status reports. ·
Use of Anritsu to obtain
performance sweeps, maintenance and to verify coaxial lines for proper site
orientation and operation. ·
Installation of MCPA
(Power-wave) and SCPA (CCI) boosters to existing sites and usage of Watt
meters for ideal transmit power adjustment. ·
Installation of TMA (Tower Mounted
Amplifier), GMA (Ground Mounted Amplifier) to various sites to boost receive
path signaling. ·
Preparation of detailed reports
and documentation for supervisor per Nokia standards. » Education CCNY - Electrical Engineering New York, NY (2003-2005) GCCC - Electrical Engineering Panama City,
FL (2007-2008) |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|